New Campus: Plans & Progress

New Campus Model Unveiled on Founders day

Front View

Plans for the new campus have been given concrete shape with the unveiling of the Architectural Model of the new campus on the occasion of the Founder's Day celebrations on August 23, 2013. The new campus includes two large teaching blocks which are interconnected at one end two provide a majestic entrance. It is being built over a land area of 10.7 Acres

The new campus will be built in two phases. In Phase I all academic blocks will be constructed in the open area. In Phase II the college will start functioning in the new building. The barracks, which are currently being used will be demolished and the residential facilities will be constructed in their place

The new campus consists of:

  1. Teaching blocks with modern lecture theatres and labs
  2. A large resource centre with library, computer centre, etc.
  3. A multipurpose auditorium with a sports centre
  4. A separate administration block
  5. Multistoried Hostel
  6. Multistoried staff quarters
  7. Principal's Residence

While the buildings will be surrounded by a groove of trees, the teaching blocks will be dotted by about 20 roof gardens. The circular resource building will have creepers hanging from window stills. The campus will have landscaped green areas, besides playgrounds

New Campus Layout Front View
View from Front Front View
View from the top Top View
View from the side Side View
Another View Side View